How to switch daycares mid-year.

Published ·Updated

A parent and toddler walking up to the front door of a new daycare center

A parent sat in my office last spring, jacket still on, asking the question I hear most in February and March: can I move my child now, or do I have to wait until fall? You can move now. Here is how to do it without losing your deposit, your new spot, or your child's footing.

To switch daycares mid-year, secure a written start date at the new program first, then give your current daycare the notice your contract requires, which is most often two weeks but can be 30 or 60 days. You owe tuition through the notice period, your deposit usually covers your final weeks if you give proper notice, and your child will need a week or two to settle in. Reading your enrollment agreement before you act is the single most important step.

Sources used throughout: NAEYC (the National Association for the Education of Young Children), guidance on transitions and continuity of care (2024); standard daycare enrollment-contract terms on notice periods and deposits (2025 industry norms); 45 CFR Part 98 (the federal Child Care and Development Fund) on subsidy provider payments; HealthyChildren.org from the American Academy of Pediatrics (AAP) on separation and adjustment (2024). Contract terms vary by provider; your signed agreement governs.

The honest tradeoff. Switching mid-year almost always costs you something up front: a forfeited deposit, two overlapping weeks of tuition, or a registration fee at the new center. If you are leaving over a safety or licensing concern, that cost is worth it. If you are leaving over a fixable annoyance, sleep on it first.

Should I switch daycares now or wait?

Switch now if the reason touches safety, licensing, or your child's wellbeing; wait if it is a scheduling or convenience issue you could resolve with a conversation. Mid-year openings are real and common, so you are not stuck until September. But every move has a transition cost for your child, so the reason should clear that bar.

In twenty years of running a center, the moves I never saw a family regret were the ones driven by a serious problem: repeated ratio violations, a director who would not answer questions, a licensing citation, or a child who was consistently unhappy and not adjusting after months. The moves families sometimes regretted were impulse reactions to one bad week. Name your reason plainly before you start.

How much notice do I have to give?

Most daycare contracts require two weeks of written notice to withdraw, and you owe tuition for that full period even if your child stops attending sooner. Some programs require 30 or 60 days. The exact number lives in your enrollment agreement under a heading like withdrawal, termination, or notice, and it sets your final bill.

Give notice in writing, dated, and keep a copy. An email counts at most centers and gives you a timestamp. If your contract has a trial or probationary window, often the first 30 days, you may be able to leave with little or no notice during it, so check that clause before you assume you are locked in.

Will I lose my deposit?

Your security deposit is usually applied to your last weeks of care when you give proper notice, and forfeited when you do not, per standard enrollment-contract terms. Registration and supply fees are commonly nonrefundable regardless. So the deposit is less a penalty than a final payment you already made, as long as you follow the notice rule.

Read the deposit language alongside the notice clause, because the two work together. A contract that says the deposit covers your final two weeks and requires two weeks notice means a clean exit costs you nothing extra. A contract requiring 60 days notice while holding a two-week deposit means you owe additional tuition. Know which one you signed.

How do I switch daycares step by step?

Move in seven steps, and do them in order. The order matters more than the speed: securing the new spot before giving notice is what protects you from a gap in care you cannot cover at work.

  1. Confirm the new spot in writing. Get a signed agreement and a firm start date from the new daycare. A verbal hold is not a spot; good programs fill openings within days.
  2. Reread your current contract. Find the notice period, the deposit rule, and any nonrefundable fees. This tells you your real cost and timeline.
  3. Line up the start dates. Aim for a short, deliberate overlap so there is no day with no care. If money is tight, schedule the new start for the day after your notice period ends.
  4. Give written notice. Send a dated email or letter to your current director. Be brief and courteous; you may need a reference or a re-enrollment later.
  5. Update any subsidy or FSA. If you receive a childcare subsidy, notify your caseworker so the new provider is authorized, per federal Child Care and Development Fund rules. Update your Dependent Care FSA provider on file too.
  6. Plan the transition with both centers. Ask the new program for a short visit or staggered first days, and ask the current one for your child's records and any portfolio.
  7. Tell your child in simple terms. A few days out, name the new place, the new teachers, and that you will pick them up, just like always.

One practical tip. Ask the new daycare for the lead teacher's name and a photo before the first day. Showing your child a picture of "Ms. Dana, your new teacher" turns a stranger into someone they have already met. It is the smallest thing and it works.

How do I help my child adjust to a new daycare?

Children settle into a new daycare with the same supports that worked the first time, per NAEYC guidance on transitions: a short and consistent goodbye, a familiar comfort item, and stable caregivers. Expect one to two weeks of extra clinginess or tears at drop-off. That is normal adjustment, not a sign you chose wrong.

Keep your goodbye brief and confident even when it is hard, because a drawn-out exit reads as worry to a child. Send a small comfort object if the new center allows it. Tell the new teachers what soothes your child, what words you use for nap and snack, and any allergies or routines. By the second week, most children have a new normal.

Frequently asked questions

How much notice do I have to give?

Usually two weeks in writing, sometimes 30 or 60 days. You owe tuition through the notice period. Your enrollment agreement sets the exact number.

Will I lose my deposit?

Most deposits cover your final weeks if you give proper notice, and are forfeited if you do not. Registration fees are often nonrefundable either way.

Should I line up the new spot first?

Yes. Get a signed agreement and start date from the new daycare before giving notice at the current one, so you never face a gap in care.

Is mid-year switching hard on kids?

Expect a week or two of clinginess. With short goodbyes, a comfort item, and consistent teachers, most children settle quickly, per NAEYC transition guidance.

What if I get a subsidy?

Tell your caseworker before you move so the new provider is authorized and payment continues, per federal Child Care and Development Fund rules.

Bottom line

You do not have to wait for fall. Confirm the new spot in writing, reread your contract so the notice and deposit hold no surprises, then give clean written notice. Plan a short overlap, prep your child with names and a photo, and brace for a couple of clingy weeks. A move toward a safer or better-fit program is almost always worth a short adjustment.

Touring daycares soon?

Get our free daycare starter kit — the 27-question tour checklist, a cost-comparison worksheet, and what to ask about waitlists. One email, no spam.

Or jump in: tour questions · cost calculator · comparison checklist